Hipe Tower is a 220-meter-high structure with a built area of approximately 90,000 square meters. The entrance to the building is through a fully excavated 65-meter-high cave called Groto, located within the island's cliffs. This cave opens to the sea and extends all the way to the top of Hipe Tower.

HIPE TOWER
Architecture Ricado Bofill
Role BIM Coordinator
Hipe Tower is a 220-meter-high structure with a built area of approximately 90,000 square meters. The entrance to the building is through a fully excavated 65-meter-high cave called Groto, located within the island's cliffs. This cave opens to the sea and extends all the way to the top of Hipe Tower.
The building is part of the proposed master plan for Jazirat Shushah Island in Saudi Arabia, featuring over 180,000 square meters of built area, developed by the NEOM conglomerate. The complex will include the world's largest coral garden, a marina, hotels, villas, a beach club, a museum, and a research center.




The building is part of the proposed master plan for Jazirat Shushah Island in Saudi Arabia, featuring over 180,000 square meters of built area, developed by the NEOM conglomerate. The complex will include the world's largest coral garden, a marina, hotels, villas, a beach club, a museum, and a research center.


Role: Development and management of BIM models across preliminary design, basic project, executive project, and Issued for Construction phases for a 200-metre-high, 90,000 m² tower in Saudi Arabia. Coordinated interdisciplinary changes and model(LOD 400) interferences through Autodesk Construction Cloud (ACC) as Common Data Environment (CDE), following ISO 19650-aligned information management workflows
Created federated Navisworks models for clash detection across multiple stakeholders and managed a team of 10 to 12 BIM modelers, ensuring compliance with standards, parameter control, 2D and 3D production, and structured model organisation including worksets, templates,shared coordinates,levels and families.


Role: Development and management of BIM models across preliminary design, basic project, executive project, and Issued for Construction phases for a 200-metre-high, 90,000 m² tower in Saudi Arabia. Coordinated interdisciplinary changes and model(LOD 400) interferences through Autodesk Construction Cloud (ACC) as Common Data Environment (CDE), following ISO 19650-aligned information management workflows
Created federated Navisworks models for clash detection across multiple stakeholders and managed a team of 10 to 12 BIM modelers, ensuring compliance with standards, parameter control, 2D and 3D production, and structured model organisation including worksets, templates,shared coordinates,levels and families.


